Singapore interior design, handed over on time or we pay you $5,000
Best Interior Design designs and renovates HDB flats, condos and landed homes across Singapore. Your designer plans the space with you, our own factory in Admiralty builds the carpentry in E0 plywood, and one project manager runs every trade to a handover date written into your contract.
WhatsApp us your floor plan
- $5,000 if we miss your handover dateThe date goes into your contract once the design is signed off. (An estimate is not a date.)
- Cabinets built in 3 to 5 weeksIn our own factory in Admiralty, while the site works run. (No outside workshop to chase.)
- E0 plywood at a third of the E1 formaldehyde limitIn every cabinet body, as standard. (Not an upgrade you pay extra for.)
- 1 itemised quote, every trade on its own linePut it beside the other quotes on your table and compare like with like.
How Best Interior Design Takes a Home From Floor Plan to Keys
You send us your floor plan and what you want from the home. We design it with you in 3D, give you an itemised quote, then measure the site for free. Once you confirm, the factory builds your carpentry while our trade partners prepare the site, and we hand over on the date in your contract.
Send your floor plan
WhatsApp it with your key collection date and a few photos of homes you like.
See it in 3D
Your designer shows you the layout, colours and storage before anything is built.
Get one itemised quote
Every trade on its own line, then a free site measurement and the firm quote.
Factory production
Typically 3 to 5 weeks, while hacking, tiling and wiring happen on site.
Installation and handover
Typically 5 to 10 working days, then a joint walkthrough and your keys, on the date in your contract.
One Team for the Design, the Carpentry and Every Trade
Many interior design firms draw the plan and pass the carpentry to an outside workshop. We build it ourselves, in our own factory in Admiralty, and our licensed trade partners handle hacking, plumbing, electrical works, tiling and painting under one project manager. One team answers for the whole job, from the first sketch to the last snag.
That matters most when something changes. If a cabinet needs to move 20 centimetres after the site measurement, the team that drew it is the team that builds it, so there is no back and forth between three companies while your move-in date gets closer.

Homes We Design and Build Across Singapore
We take on HDB flats from BTO to resale, condos new and old, and landed homes where the work is inside the house. Each home type has its own rules and its own costs, so each has its own page with packages, timelines and the questions owners ask us most.
- HDB flats: BTO keys, resale makeovers, and the HDB rules that shape both.
- BTO renovation packages for 3, 4 and 5-room flats, priced before you collect your keys.
- Condo interiors for new and resale units, with the MCST paperwork prepared for you.
- Landed homes, interior work only, with one team accountable for every room.

3-room HDB, Punggol
An L-shaped kitchen, a tall oven tower, a kitchen island, and hallway storage built to match.

Parc Esta loft condo
A TV console that runs to the window, a dining console, a fluted wall behind the bed and lit niches.

Riversound Residence
A lit lattice display wall at the end of the dining area, and a pet house on the balcony.

Dairy Farm Residences
A wardrobe that goes all the way up, a cabinet over an open niche, and a raised platform bed.
The homes in this carousel are carpentry jobs built in our factory: a 3-room HDB kitchen in Punggol, built-ins through a Parc Esta loft, a lit lattice display wall at Riversound Residence, and a wardrobe and platform bed at Dairy Farm Residences.
What a Whole-Home Renovation Costs With Us
Whole-home packages start from $22,000 for a 3-room BTO, $26,000 for a 4-room and $30,000 for a 5-room, with 9% GST included. Resale flats start from $50,000 because they usually need hacking, rewiring, new floors and toilets. Condos start from $24,000 and landed homes from $80,000.
| Home | 2026 cost guides | With us |
|---|---|---|
| 4-room BTO renovation | $40,000 to $60,000 | from $26,000 |
| Resale 4-room HDB | $55,000 to $83,000 | from $50,000 |
| New condo | $44,000 to $62,000 | from $24,000 |
| Resale condo | $78,000 to $105,000 | from $60,000 |
Carpentry is usually the biggest line in a renovation budget, about 28% to 35% of it by 2026 cost guides, and it is the line we build ourselves. Every package and what it contains is on our packages and prices page.
Guaranteed Handover On Time, Else We'll Pay You $5,000
Your handover date goes into the contract once your design is signed off and the site is measured. If we miss it, we pay you $5,000, taken off what you still owe at handover, with any balance paid by bank transfer within 7 days. The full terms of the on-time guarantee sit on one page.
The date only moves for the reasons written into those terms, such as changes you ask for after confirmation, or an approval from HDB or your MCST that arrives late.
On-time handover, or we pay you $5,000
Your handover date is written into the contract once the design is signed off and the site is measured. Miss it, and the $5,000 comes off what you still owe.
Design and a 3D preview
See the layout, colours and storage of every room before anything is built.
A free site measurement
Then the firm quote, with every trade on its own line.
E0 plywood in every cabinet body
Built in our own factory in Admiralty, as standard.
One project manager
Hacking, plumbing, electrical works, tiling and painting run to one schedule.
A factory visit before you sign
See the boards, the finishes and cabinets in production for other homes.
E0 Plywood in Every Cabinet You Will Live With
Every cabinet body we build is BestPly E0 plywood, which releases at most 0.5 mg/L of formaldehyde, a third of the E1 limit. That matters in a new flat with the air-conditioning on and a baby in the next room. It is the standard board in every package, not an upgrade you pay extra for.

See Your Cabinets Being Built Before You Commit
Before you sign, you can visit our factory in Admiralty and see the boards, the finishes and cabinets in production for other homes. Many firms show you a showroom sample. We would rather show you the machines, the materials and the people who will build yours, so you know exactly what you are paying for.
Factory visits are arranged by appointment once we have your brief, at Northlink Building, 10 Admiralty Street.
Frequently Asked Questions
Is Best Interior Design an Interior Designer or a Renovation Contractor?
Both. Our designers plan and draw your home, our own factory builds the carpentry, and licensed trade partners we coordinate carry out the hacking, plumbing, electrical works, tiling and painting. You deal with one company and one project manager throughout.
How Much Does a Full Home Renovation Cost in Singapore?
With us, whole-home packages start from $22,000 for a 3-room BTO and from $50,000 for a resale 4-room flat, with GST included. The final figure depends on how much carpentry you want and the works your home needs, which is why every quote lists each item separately.
How Long Does a BTO Renovation Take?
Carpentry is typically built over 3 to 5 weeks in our factory while the site works run, and installation takes about 5 to 10 working days after that. Your exact handover date is written into your contract once the design is signed off and the site is measured.
What Happens If My Renovation Runs Late?
If we miss the handover date in your contract, we pay you $5,000. It is taken off what you still owe at handover, and any balance is paid to you by bank transfer within 7 days.
Can I Visit the Factory Before I Sign?
Yes. Once we have your brief, we can arrange a visit to our factory in Admiralty, so you can see the boards, the finishes and cabinets being built for other homes.
How Do Payments Work?
Payments are progressive, and the schedule is written into your quotation before work starts, so you know exactly what is due at each stage.
Send us your floor plan and a few photos of spaces you like.
WhatsApp us your floor plan and key collection date